Keep Exploring Architizer by Creating a Free Account or Logging in.
This feature is for industry professionals.
To unlock it, signup and then join or add your company.
To unlock this feature,
signup and then submit your professional details.
Proposed front entrance canopy, never constructed, that attempted to match the finishes of the existing building using brass & glass. Any water was to flow back towards the building into drain pipes built into the canopy columns.