The project calls for a seaweed processing plant that requires areas for drying, milling, packaging and storage of finished products. In addition, offices as well as quarters for the workers need to fit into the 500sqm building.
To streamline the production process, raw materials are lifted to the third floor for drying, dropped into a chute through the mill, then packed and stored at the ground floor ready for pick-up at the loading dock.
A structure that looks both modern and traditional will fit right in Bantayan Island’s laid-back community in keeping with the client’s project brief.