*DS's fully participation to Marriott Courtyard Hotel construction document projects while working at mentor architect office in USA 2005 thru 2007.
DS's mentoring architect office started various schematic designs with such a small team on 2006.
DS team was hired to be study the Marriott Standards and become knowledgeable enough to accomplish specific hotel drawings for mentor architecture office. DS worked on phase I and also phase II layouts including design development thru construction documents preparation. Interior, exterior detailing, applying Marriott standards as well as occupancy, ADA, exiting requirements.