Main objectives of the project are:
- to fit a building into a lot (difficult of geometry)
organically,
- to separate the parts of the building (different in
function) from each other as much as possible,
- to make compact horizontal and vertical
communications,
- to consolidate floors of a building different in the
area in uniform volume
First two
floors of a building (maximum of the area) are solved in the form of a podium,
other elevated floors form uniform volume. This volume grows out of
"transition" of the plan of the hexagonal form (the area - 900 sq.m.)
in the plan of the triangular form (the area - 600 sq.m.)
All vertical
communications are located in the centre of the building. Lifts with a stairway
of offices are partitioned from a stairway with the lift of apartments. Loading
of a warehouse and entrance of garage are located from a yard side. Entrances of
the shops, offices and apartments are separated from each other and carried out
from Vali Asr avenue
and Salmak street.
Underground
floors, where the 4-storeyed parking area is located, are solved (for economy
of space) in the form of a helicoid approach ramp with a downgrade of 5 %.
The technical
floor is located over apartments. The building roof is maintained by its tenants
for their purposes. Synergetic fasades are used on a south side of the building.
The glass
facades of a building personify company Benetton openness, and the usage of different
colour tinted glasses is demonstrated many-sided nature of the company.