Housing production of prefabricated concrete elements, the scheme of the complex comprises two linear structures of production areas and an office building at the front. Vertically pronounced frontal element of the office building comprising secondary spaces establishes the dynamic of the scheme. Clad in metal panels in two contrasting colours, it defines the starting point of the complex. Dynamic horizontal volume behind it houses offices, it is finished with vertical seams and pronounced window openings. In the back, various production facilities executed in basic materials conclude the scheme as static elements.