Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
CPMS Office Building and Production Facility  

CPMS Office Building and Production Facility

Lipovci, Slovenia

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

CPMS Office Building and Production Facility

Lipovci, Slovenia

Firm
YEAR
2003
SIZE
300,000 sqft - 500,000 sqft
Housing production of prefabricated concrete elements, the scheme of the complex comprises two linear structures of production areas and an office building at the front. Vertically pronounced frontal element of the office building comprising secondary spaces establishes the dynamic of the scheme. Clad in metal panels in two contrasting colours, it defines the starting point of the complex. Dynamic horizontal volume behind it houses offices, it is finished with vertical seams and pronounced window openings. In the back, various production facilities executed in basic materials conclude the scheme as static elements.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Architecture

Team