Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Court building  

Court building

Payerne, Switzerland

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Boegli Kramp Architekten AG

Add To Collection Add to Collection

La Branche Home for the Disabled

Court building

Payerne, Switzerland

Type
STATUS
Built
YEAR
2016
SIZE
10,000 sqft - 25,000 sqft
The new seat of the Arbitration Court and the Debt Enforcement Office is situated in a row of houses directly in the historical city centre, on a narrow, deep plot between two firewalls.
Two “building sections” develop from the two adjoining streets into the depth of the plot and are connected to an access area, while being “separated” by an inner courtyard. Above the entrance from the front street, a skylit hall with a spacious staircase is situated centrally on the lowest level for communal public uses. Above it, the Arbitration Court and the Debt Enforcement Office are separated by each “house” and accessed by a rear private entrance. The entrances split the public and internal accesses of the two street façades and enhance the presence required on both street façades.

By interpreting the heterogeneous architectural context , the appearance of the new building is reserved, but nevertheless integrated into the row of houses in an independent way. Various building elements that exist there are picked up on and expressed in a contemporary way with respect to the materials. The roof form basically follows the existing order, but is placed over both “houses” and covers the courtyard to support the development’s unity. The building’s durable, sustainable materials strengthen the inner urban context and continue the expression of public buildings.

All photograps by Thomas Telley, St. Antoni, Switzerland

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team