The project concerned mainly in transforming an old former factory in an office building, respecting the original shape and actualizing it for the regulations for energy saving.
Every detail was studied to respect the old building, so everything was designed in the typical way of the years it was originally builded, from the windows to the grids, from the doors to the gate, from the frames to the roofing system.