Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Concurso Nacional - Hotel Paineiras  

Concurso Nacional - Hotel Paineiras

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by fmb | arquitetos

Add To Collection Add to Collection

Apartment Remodel

Add To Collection Add to Collection

CMF Residence

Concurso Nacional - Hotel Paineiras

The main idea of the project for the Complex-Hotel Paineiras is to organize various activities that comprise this set. If we, the flow of vehicles leaving the city and leave the tourists on the basis of access to Christ , flows of vans and taxis carrying tourists from the base to the Christ, the flow of tourists arriving by train , the flow of guests and hotel employees and flows of public convention center and restaurant. Believing that architecture is a simple answer to a complex question, answer complexity of flows through a large shaft that part of the launch of the website until the end, on a runway marked by a steel frame and wood in three distinct stages: the transfer station (as a structure that houses the set of ramps) at the train station (as a doorway for access) and hotel (as an element that intersects the main volume and mark your entry). For this axis can move within the complex without coming into contact with the interference of the road system. To organize the flow of vehicles has been defined as follows: that the parking should be underground and take advantage of the topography of the site to minimize the impact of excavations, which as you enter the site being targeted vehicles in the city paineiras flow, which in Est access to Corcovado was driven flow of vans carrying tourists to Christ, that the hotel was created a loop of loading and unloading for the comfort of guests and it was kept the original design for the Redeemer Est. Thus, the program was developed combining the local control of flows associated with linearity of the main axis. So now we are in the main square of the observatory, the hotel (which had rooms oriented view), the convention center (with a new auditorium attached to the old building), the restaurant (on the same site of the former, with a view of the city and up a cafeteria attached to the square). For the treatment of buildings to be maintained, many internal fences were demolished, but the aspect exeterno generally been held with the limitation of treatment to recover acabamentos.Ao maintain the appearance of the main existing buildings ensured that its symbolic value remains for Over the years, juntoo composition with new forms and materials, in order to create an integrated complex, both functionally and visually.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Architect
Architect
Architect