Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
citizenM Bowery  

citizenM Bowery

New York, NY, United States

Finalist, 2019 A+Awards, Concepts - Plus - Architecture +Prefab
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Stephen B. Jacobs Group

Add To Collection Add to Collection

Solari NYC

Add To Collection Add to Collection

ALTA LIC

Add To Collection Add to Collection

Hotel X Toronto

Add To Collection Add to Collection

The Skyroom

Add To Collection Add to Collection

Gansevoort Park Avenue Hotel

citizenM Bowery

New York, NY, United States

Finalist, 2019 A+Awards, Concepts - Plus - Architecture +Prefab
STATUS
Built
YEAR
2018
SIZE
5000 sqft - 10,000 sqft
This new 19-Story, 100,000 SF hotel is located at 189 Bowery, in the lower east side of Manhattan. Originally designed as a conventional poured-in-place concrete building, our innovative client, citizenM, decided to have us redesign the building using modular construction. citizenM Bowery is the tallest modular hotel in the world, on the oldest thoroughfare in Manhattan.

Because of the change in structural system, the double height mechanical room, originally located on the 18th floor, was moved to the 3rd floor, and a three-foot-thick concrete ‘mat-in-the-sky’ was poured on the fourth floor, on which the modules are stacked. The hotel consists of 210 guestroom modules, the majority of which are doubles (guestroom-corridor-guestroom) for a total of 300 rooms. The hotel also includes a double height lobby and lounge and a rooftop bar with outdoor space and spectacular views.

As executive architects, SBJGroup also coordinated the interior design received from the Amsterdam based firm, concrete.

Credits:
- concrete / citizenM - creative director - rob wagemans
- Stephen B. Jacobs Group, PC - executive architect - Isaac-daniel Astrachan
- concrete - proejct architect - maarten de geus

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team