A $170 million vertical expansion of the existing central garage structure. A unique collaboration through a public art program resulted in an integrated structure, architecture, sound and colored light intervention at the two primary circulation towers, creating an unexpected traveling experience at the airport. 3,000 additional parking spaces on three levels; new stair and elevator towers; new facades; and new pedestrian connections to terminal destinations via elevated walkway bridges.