Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Cairo International Airport Terminal-3  

Cairo International Airport Terminal-3

Cairo, Egypt

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by GMW MIMARLIK

Add To Collection Add to Collection

Portonovi Luxury Resort

Add To Collection Add to Collection

Philippines Clark International Airport Terminal

Add To Collection Add to Collection

Prototype Terminals in Saudi Arabia

Add To Collection Add to Collection

Mus Airport

Add To Collection Add to Collection

Riyadh King Khaled International Airport T 5

Add To Collection Add to Collection

Tehran International Airport T 2

Add To Collection Add to Collection

Eurasia Tunnel Operation and Maintenance Building

Add To Collection Add to Collection

Esenboga Aircraft Hangar

Add To Collection Add to Collection

Riga International Airport

Add To Collection Add to Collection

Istanbul Ataturk Airport International Terminal

Add To Collection Add to Collection

Riyadh Airport Initial Project

Cairo International Airport Terminal-3

Cairo, Egypt

STATUS
Built
YEAR
2008
SIZE
1000 sqft - 3000 sqft
In 2007, GMW MIMARLIK was appointed to provide full architectural design services by the Design and Build Contractors responsible for the construction of the new 11 million pax Terminal 3 at Cairo International Airport. Planned on three full and three mezzanine floors, the terminal building is connected to a 3-storey pier structure, which provides 22 boarding lounges, two of which have been adapted to serve the new generation airbus A380. The project also includes an apron control tower and a 3-storey bridge structure spanning between Terminals 2 and 3.

The original project designed by NACO (Holland) and ECG (Egypt) has been developed to comply with the up to date international design standards, operational requirements, and the regulations for acoustics and earthquake resistance. The interior design has also been adapted to provide a contemporary airport environment equipped with the most advanced technologies and airport systems.

Client: TAV
Use: International Passenger Terminal
Gross floor area: 200,200 sqm
Completion: Spring 2008

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team