An existing and outdated sports facility and swimming pool of 5,000 m² is transformed into an extremely sustainable multipurpose sports complex of 10,000 m².
Both old and new will be highly insulated with special sustainable materials such as vegetable white roofing and a facade that looks different from every angle. The complex will be equipped with full service air conditioning and individually dimmable spot lighting, that ensures the most efficient lighting situation for each use.
Optimal logistics is crucial: atelier PRO has succeeded in separating different visitor flows within one entrance hall. The different sports halls can be connected for large scale events via a wide corridor.