Client Profile:
World’s top building construction & engineering company based in the USA.
Client Requirements:
The client required structural drawings and Revit 3D BIM models with LOD 300 standards for the construction of hospitality building based in the USA.
Software used: Revit, Navisworks
Our Inputs & Solution:
Hi-Tech created and delivered Architectural, Structural and clash-free MEP BIM Model for a building construction company, with LOD 300 as output. Also provided material take-off & project completion schedules to reduce overall project time, the cost for the error-free and smoother construction process.
We have also solved the problematic side cutting fields in the basement, where the dimensions and survey points were not matching.
Advantages & Industry Data:
• Seamless construction planning
• Coordination with building product manufacturers
• Improved clash detection and avoiding rework
• Improved construction scheduling for complex projects
• Provides accurate cost planning
For more details: http://bit.ly/2Y24DAt