The only station built as part of the Montclair Connection project this facility is all-exterior with canopied waiting areas, glazed over-track bridge, stairs and elevators.
Materials include custom steel superstructure, brick and stone veneer cavity walls, copper shingle roofing, perforated steel railings, and fretted glazing at the skylight canopies (endcaps and stair protections).