A renovation and expansion of the University of Oregon's football stadium, including additional above-ground bleacher seating and a six-story press box. The seating bowl, Club Level, and Suite Level 1 are precast concrete. Suite level 2, the Press Level, and the Camera Platform are composite steel. The roof is structural timber which cantilevers out over the seating area 97 feet. The project was designed using precast concrete extensively to allow demolition of the existing stadium and construction of the new stadium to be completed between the 2001 and 2002 football seasons.