Once the structural reinforcement of the
structure is carried out, the three sandstone partition walls are to be
demolished. In this way, the house can be structured around the external and
supporting walls. The project contemplates the possibility of creating two
separate functional spaces, one private and one public. The original hydraulic
tiled flooring is maintained, as is all existing carpentry in the building.