As per the Stage -II tender document received from Government of India Central Public Works Department Navi Mumbai Central Division the following points could be listed as the design requirements:
• Multi-storied building
• Centrally air-conditioned
• Double-stilt parking
• Upper floors to avail balance FSI
• Annexe building to merge and have homogenous look with the existing building
• Contemporary, energy-efficient as per GRIHA rating system of TERI
• Accelerated speed of construction and cost effiective
• Design efficiency