The new building had to reflect a corporate and industrial image at the same time, as it was located on the same floor. It also had to be extremely flexible, since it will be built in stages, so it was decided to propose it with a steel structure, for greater cleanliness and speed in the different stages of construction. Finally, the image of the building would be achieved through its very function and structure, the latter being an essential part of the architecture itself.