Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Reconstruction of the 1st Powerplant building  

Reconstruction of the 1st Powerplant building

Russia

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by A61 Architects

Add To Collection Add to Collection

Siberian Retreat House

Add To Collection Add to Collection

THE NATURAL GEOMETRY PARK

Add To Collection Add to Collection

The house with a Scandinavian accent

Add To Collection Add to Collection

Urban villa

Add To Collection Add to Collection

City villa

Add To Collection Add to Collection

Gazpromneft Office

Add To Collection Add to Collection

Landform House

Reconstruction of the 1st Powerplant building

Russia

Type
STATUS
Under Construction
The building of the first power plant in Tyumen was built in 1893 by Ignatov - a well-known steamship owner, founder and owner of Zhabynskiy mechanical plant. The power plant is a historical and cultural heritage, is a one-storey red brick building with a long volume that belongs to the rare nowadays type of industrial buildings. The goal of design was to renovate the industrial building for an office function.

The reconstruction project expected a careful restoration of the monument, which gives the object a new life at nowadays, maintaining the unique character of an old building. The project provisions the restoration of the roof, the preservation and restoration of the exterior walls and decor. Adaptation of the building to a new function is planned through the reconstruction of the interior space - the interior "core" will be a stand-alone metal frames, not adjoined to the outer walls, that makes possible to set up a mezzanine floor in the center of the building. All the communication facilities that do not require natural lighting are located at the 1st level of structure. The perimeter of the building will remain open and two storey, it contains a working space that is implemented in a Open space format. On the mezzanine floor there are administrative offices.

Landscape of the building is a modern solution with court area for staff and the parking. Along the perimeter of the building there is a system for the water collection from surface with a tap away.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team