Metropolitan Washington Airports Authority
Ronald Reagan Washington National Airport
Contract No. SC-23-XXXX (TBD)
General Construction Services
Task Order TBD
Terminal 2 Ticket Level
North & South Bridge Expansion Joints Replacement
General Work Effort:
2.01 This involves the four (4) roadway expansion joints that run perpendicular to the
terminal buildings (at the north and south ends).
2.02 Remove the existing rubber expansion joint gland and replace it with a new one.