Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
The new FIM headquarters  

The new FIM headquarters

Mies, Switzerland

Project Featured on Mar 28, 2017
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by LOCALARCHITECTURE

Add To Collection Add to Collection

BOIS-GENOUD SECOND PAVILION

Add To Collection Add to Collection

DAILLENS SPORTS FACILITY

Add To Collection Add to Collection

BOULIMIE THEATER RENOVATION

Add To Collection Add to Collection

LE VAUD POLYVALENT HALL

Add To Collection Add to Collection

AVENIR HOUSING

Add To Collection Add to Collection

RUDOLPH STEINER SCHOOL OF GENEVA

Add To Collection Add to Collection

NEW APOSTOLIC CHURCH

Add To Collection Add to Collection

FLON HOTEL

Add To Collection Add to Collection

Urban House in Neuchâtel

Add To Collection Add to Collection

Entrance Pavilion at La Garrenne Zoo

Add To Collection Add to Collection

The New Swiss Embassy in Abidjan

Add To Collection Add to Collection

Rovereaz Housing

Add To Collection Add to Collection

Verdeil Foundation School

Add To Collection Add to Collection

Two-Family House in Maracon

Add To Collection Add to Collection

Steiner School in Bois-Genoud

Add To Collection Add to Collection

Shed in Lignières

Add To Collection Add to Collection

Housing in Chailly

Add To Collection Add to Collection

Cow Barn in Lignières

Add To Collection Add to Collection

Logements à Corsy

Add To Collection Add to Collection

Temporary Chapel for the Deaconesses of St-Loup

The new FIM headquarters

Mies, Switzerland

Project Featured on Mar 28, 2017
STATUS
Built
YEAR
2016
SIZE
1000 sqft - 3000 sqft
Introduction
Elegant and iconic, the new headquarters of the FIM (International Motorcycling Federation) had to wait ten years before taking shape on a site in the outskirts of Geneva where road and railway meet.
It was in 2006 that LOCALARCHITECTURE and Bureau d’Architecture Danilo Mondada won the competition (conducted by the MEP – Mandat d’Études Parallèles – parallel development selection process) for the extension of the International Motorcycling Federation’s main headquarters in Mies in the canton of Vaud. Following a change of administration at the FIM the project was abandoned. A new selection procedure with invited architects was launched in 2013, with a modified functional programme. At this point the mandate was awarded to LOCALARCHITECTURE.

A pavilion in a park
Set between the railway and the cantonal road connecting Geneva to the canton of Vaud, on a sloping terrain with trees, the new international headquarters of the motorcycling world has the air of a pavilion in a park. The building occupies the lower part of the naturally landscaped plot, an imposing circular presence when seen from the adjacent roundabout.

Acceleration, speed and kinetics
Set on a base which raises it above ground level and protected by a wide flat roof supported by fine columns, the building stands out as the focal point in a diverse architectural context.
Its circular forms evoke the movement and speed of the motorcycling world, suggested by the dynamic arrangement of the offset oval slabs connected by a forest of pillars. The vertical rhythm of the pillars and the depth of the façade produce a kinetic effect when viewed by passing drivers on the cantonal road or passengers on the railway.
The building is accessed by a path adjacent to the site. The main entrance connects directly to the access road while a secondary entrance on the north side of the building connects to the staff car park.

Light and transparency
The new FIM building replaces the former headquarters, which was demolished. It comprises two storeys over the existing basement level and is accessed by two entrances, perpendicular to the façade, on the ground floor. They define the regular grid of the floorplan, leading users to a central hall which provides access to the various functions. The ground floor houses the major communal spaces: the auditorium and the training room on the east side, the cafeteria and exhibition space to the south. The spaces are designed to be flexible and modular.
At the heart of the building, with natural lighting from the skylight domes, is a monumental staircase that connects the two levels. Its spiral form extends the upward movement of the entrance hall, leading towards the administration and management facilities on the upper storey. Cast in concrete as a single unit, its triangular underside suggests a vertebrate structure – like a spinal column bearing the transparent framework of the building as a whole.

User comfort
The building’s technical facilities were developed to ensure maximum flexibility for its users. In the peripheral office areas, the thermally active slab system provides heating and cooling from the ceiling, while the ventilation system and electricity network are fitted below the raised floor. The hall and circulation areas are free of all technical installations except for the floor at ground level, which is heated. Building acoustics are managed via circular baffles arranged on the office ceilings. Seasonal overheating from solar energy is managed at ground level by a system of external blinds and on the upper storey by the oversized roof slab, its contour designed to match the sun’s pathway across the sky.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team