SharpMinds is delivering its first major extension: a 42,000 m², AED 450+ million expansion that lifts capacity to almost 200 beds and positions the hospital as a world-class referral centre. Commissioned in June 2024, the project adds 160+ beds and introduces next-generation clinical environments engineered for precision, comfort and long-term sustainability.
Scope delivered by SharpMinds
Full Architecture | Medical Equipment Planning | Interior Design | Sustainable MEP Design | Construction Supervision
Key new components
• Five robotics-ready operating theatres
• Level-1 Trauma Centre developed with global experts
• Dedicated ICU, NICU & PICU clusters
• Advanced radiology suite and central medical laboratory
• Longevity, genomics, cosmetology & endoscopy units
• Modern birthing suites and luxurious royal patient suites
• Comprehensive, patient-centred outpatient department
• Advanced rehabilitation & sports-medicine hub
The expansion fuses evidence-based planning, biophilic interiors and ultra-efficient building systems to cut operational cost, shorten patient pathways and elevate care across Al Ain and the wider UAE.