The project is located in the “Jardín D`Obradors Sur”, pretending to be a new attraction for the people during the summer months. From an irregular plot and restrictive planning regulations raises a number of buildings with circular plant with two main objectives; in one hand get the inside circulations as much fluid as possible; In the other, remove the corridor roof of the buildig to fit the entire program required. The access leads to a small square from which you can view all access to the different buildings thus facilitating orientation within the complex. Once through the square, the pools. The materials are minimum: concrete, steel and glass. Raises twelve independent buildings. One for each of the different uses needed for the pools: access, showers, toilets, nursing, bar, and storage facilities. Monolithic concrete buildings bathed in natural light inside are forming a small square providing access to the pools. Three pools of different sizes and depths are distributed in the remaining areas of the ground. Around of them, recreational beach areas.