Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Rabobank Westelijke Mijnstreek Advice Centre  

Rabobank Westelijke Mijnstreek Advice Centre

Sittard, The Netherlands

Project Featured on Jul 01, 2014
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Mecanoo

Add To Collection Add to Collection

People Place Purpose Poetry Book

Add To Collection Add to Collection

International Quarter London North

Add To Collection Add to Collection

Heerlen City Hall and Municipal Offices

Add To Collection Add to Collection

Taoyuan Station

Add To Collection Add to Collection

Perth Museum

Add To Collection Add to Collection

People Place Purpose Poetry Book

Add To Collection Add to Collection

One Silk Street

Add To Collection Add to Collection

Shenzhen Guangming Scientist Valley

Add To Collection Add to Collection

Jacob’s Pillow Doris Duke Theatre

Add To Collection Add to Collection

Villa BW

Add To Collection Add to Collection

Unilever Benelux Headquarters

Add To Collection Add to Collection

Amstel Design District

Add To Collection Add to Collection

Heungkuk Tower Busan

Add To Collection Add to Collection

Natural History Museum Abu Dhabi

Add To Collection Add to Collection

World Port Centre Rotterdam

Add To Collection Add to Collection

Stavros Niarchos Foundation Library

Add To Collection Add to Collection

Macau Central Library

Add To Collection Add to Collection

Spoorzone Dordrecht

Rabobank Westelijke Mijnstreek Advice Centre

Sittard, The Netherlands

Project Featured on Jul 01, 2014
Firm
Type
STATUS
Built
YEAR
2014
SIZE
25,000 sqft - 100,000 sqft
Rabobank Westelijke Mijnstreek’s new Advice Centre is centrally located in Sittard and will house approximately 320 employees in an inspirational working environment. The bank’s clients and customers will be welcome at the Advice Centre for advisory discussions and meetings. Rabobank is a cooperative bank with an open culture and community-oriented, cooperative approach.

Mecanoo translated these key values by designing an open and attractive advice center that is both literally and metaphorically connected to its environmental context, its customers and employees. Natural materials are utilized inside and outside, including: wood, stone, brick, steel and glass. With its elevated position on an artificial mound, a visual connection is created with the lush and rolling landscape of the province of Limburg.

Reflecting Rabobank’s corporate transparency, its three impressive wings terminate in glass façades which extend over three floors, making everything that happens inside the bank visible from the outside. These façades consist of brick and marlstone which are a reference to the marl-rich soil of the surrounding area. Consistency between inside and outside is established with a stone floor that extends from the outside area to the central hall and the meeting rooms.

Upon entering the building, one immediately feels welcome in the lively meeting space that is the central hall. Here in the heart of the building, the logic behind the design becomes immediately apparent with a large auditorium and adjacent restaurant to the left and meeting rooms in the wing to the right. This open layout makes it possible to see all the activity taking place in the upper level floors higher up in the offices, the flex center, and the call center. Sculptural roof lights and cleverly positioned artificial light emphasize the shape of the building.

The large auditorium is not only suitable for informal discussions or as a flexible workspace, but also for (external) lectures and events. A semi-transparent curtain of more than 32 feet high encircles the auditorium, enriching the space and creating a beautiful effect. By adjusting the curtain in different positions it’s possible to create a variety of different atmospheres, from an open space to one with a more introverted and intimate character. The concept for the layout of the Rabobank Westelijke Mijnstreek is based on Het Nieuwe Werken a philosophy for alternative working practices that focuses on innovation, participation, and results-oriented ways of working.

The new Advice Centre is set up in such a way to inspire employees, enabling them to work together, meet each other, exchange knowledge easily and feel connected with the bank. Depending on the need, employees can choose from different types of workspaces, such as conference rooms, meeting points, areas facilitating interaction or concentration.

The sustainability score of the building is BREEAM Very Good and the bank is linked to Het Groene Net (the Green Network) in Sittard, which makes use of residual heat from the Chemelot industrial zone, meaning there’s no need to generate energy for individual heating or cooling requirements. Ventilation, heating and cooling systems are controlled by the air conditioning in the ceilings.

In addition, the building has a flat panel air conditioning system facing south that reflects some of the solar energy on warm days, while the heat of the sun between the façade and the screen is mechanically extracted so that the auditorium remains pleasantly cool.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team