The project follows the program of a school complex of 10 elementary classes and 5 nursery classes. In level one of the nursery school slips under the curve of the building which receives on the floor the elementary school. The 2 white concrete curves surround a space full of tension and walking round trip through the spaces. About urban approach, the typical district consists of buildings parallelipedic and rigid from the sixties. The school is a transition with continuity from an urban unit made of little single houses. The client ( town of Montargis) was intersted with this competition project because of the urban potentiality of a free, but controlled, and optimized form. The link with the stage is made by a large slope, and the pupils join the adventure playgrounds thus. Environmental, the school implements materials answering their function: the clear white concrete makes the envelope, the flagstones out of wooden, the roof frame is made of steel, the roof is entirely made of special plants. Le projet suit le programme du groupe scolaire de 10 classes élémentaires et 5 classes maternelles. En rez de chaussée la maternelle se glisse sous la courbe du batiment qui reçoit à l’étage les grands élèves de l’école élémentaire.Les 2 courbes de béton blanc entourent un espace fait de tension et parcours.Le quartier typique est constitué de bâtiments des années 1960 parallélépipédiques et rigides. L’école fait transition avec la continuité d’un ensemble urbain de pavillons et maisons.Le client a saisi la potentialité urbaine d’une forme libre, mais maitrisée, et optimisée. La liaison avec l’étage se fait par une grande rampe, et les élèves rejoignent ainsi les aires de jeux.Environnementale, l’école met en œuvre des matériaux répondant à leur fonction : le béton fait l’enveloppe, les dalles en bois, la charpente est en acier, le toit est végétalisé.Porject : Ecole Jean-Moulin - Montargis
Architects: richard+schoeller
Location: Montargis ( Loiret) France
Architect: isabelle Richard, Frederic
Schoeller
Area: 2800 sqm
Cost : 6 000
000 € TTC
Year: 2013
Photographs: Luc Boegly
Emmanuelle Blanc (004_BLE0428533, 002_BLE0428531), David Boureau (classroom,
curve 1 curve 2, exterieur)
Quntity Surveyor: DAL, Paris
Engineer: Alpes Structures, ESTB
Construction Company: TPBAT
Budget: 6
000 000 € TTC
Client : Mairie de Montargis
Material :
Concrete white in situ
Wood for the fllor
Roof steel
Waterproof : Siplast / vegetation
Door : lain wood
Window and Frame : Stabalux wood
Floor linoleum
Plaster placostil distribuiton
Google map : https://maps.google.com/maps/ms?msid=201849932588021795014.0004ddc2683e5da3a44dd&msa=0&ll=47.993505,2.740531&spn=0.003676,0.007156