The assignment was to make a polyvalent building at Bispetorv square in Aarhus. The 3 main characteristics in this multipurpose room is: a level changing floor that divides the room into different areas and a pillar-based construction taking the load from the 1st floor and ceiling and keeping most of the building as open to the public as possible.
Possible activities that could take place in this room include concerts, theater plays, musicals, dancing, lectures, fashion shows and exhibitions, both oriented in or around the lower or upper stage, since each change in levels, can be used as seating or stage.
Sustainability is achieved by shading mechanisms, optimizing the use of sunlight for heating and light, controlled through shading of the building.