Design of Civil Works with 2 Wagon tipplers, Stacker - reclaimer, Underground tunnels, Crusher house, U.G. Transfer towers, Trestle foundations, MCC Rooms, DE/DS system, etc. Approving agency for the project was NTPC. The Project was awarded to turnkey supplier ThyssenKrupp. The design successfully overcame several difficult site conditions. The site had water logged soil, poor load bearing capacity and was located within an existing Thermal Power station amongst other constraints. Various technically complex solutions were devised and implemented.